Application of Ashbond Putty and Painting the Partition

Finishing work can start 7–10 days after construction to allow full mortar setting. Apply a thin layer of Ashbond putty over grooves, joints, and then the entire partition. Install mesh where partitions meet concrete walls or ceilings. After cleaning, paint with any suitable interior paint, allowing 4 hours between coats. If stains remain, apply a primer diluted with up to 20% turpentine, wait 24 hours, then apply the final coat.

Tile Laying on Ashbond Partition  

The adhesives, bonding method, tile type and weight and the height to which tiles are laid shall comply with Israel Standard SI 1555. Porcelain/ceramic tiles shall be attached using acrylic adhesive to the manufacturer’s directions. Alternative materials and technologies are permitted, provided they are implemented in accordance with the manufacturer’s directions and at its sole responsibility.